3A/169 Darlington Drive, Banora Point NSW
Karen & Rick Scanlon-Hughes
Demolition and reconstruction of the rear and front retaining walls, with excavation of the upper garden area.
Border Rock Walls will demolish and remove the existing crib retaining walls at the rear and front of the property, excavate the upper garden area above the rear wall to create a more manageable, level space, and construct new concrete block retaining walls in their place using a large interlocking concrete block system.
At the rear of the property this includes a new retaining wall running 22 lineal metres, and a second wall above it running 18 lineal metres, set back from the rear fence. At the front of the property, a new wall will be constructed in three sections, stepping down in height along its length. All new walls include drainage aggregate, agricultural drainage pipe and geotextile filter fabric behind the wall face.
The upper garden area above the rear wall (approximately 82m²) will be excavated to create a level, low-maintenance space, with the excavated material removed from site.
We will also remove and dispose of the five golden cane palm stumps and root balls from site, once the trees themselves have been felled by others (see Exclusions). Colorbond fence panels will be removed as needed for site access and refitted on completion, existing timber sleepers will be removed and disposed of.
Every item covered by this proposal — and what sits with others.
Standard conditions applying to this proposal.
All prices in Australian dollars, excluding GST unless stated.
| # | Description | Amount ex GST |
|---|---|---|
| 1 | Demolition and removal of existing crib retaining walls (rear and front of property), excavation of the upper garden area, and removal of tree stumps, fence sections and sleepers as described in the scope above. | $6,558.58 |
| 2 | Construction of new concrete block retaining walls (rear and front of property) as described, including drainage aggregate, agricultural drainage pipe and geotextile filter fabric, and all associated plant, machinery float and site works. | $17,626.06 |
| Subtotal ex GST | $24,184.64 |
| GST (10%) | $2,418.46 |
| Total inc GST | $26,603.10 |
Given the height of the new walls, we recommend including structural engineering design, certification and site inspection. This has been priced separately below as an optional addition — let us know if you’d like it included and we’ll issue it as a variation to the accepted quote.
| Engineering design, certification and site inspection — ex GST | $1,800.00 |
| Total inc GST | $1,980.00 |
Border Rock Walls has been building structural basalt retaining walls across the Tweed Coast–Gold Coast corridor and into Northern NSW for over two decades. We operate our own quarry near Murwillumbah — when we specify basalt, we control the supply chain from the ground up.
We don't subcontract our core work. Our crew, our plant, our rock. All walls are built to our own proven dry rock methodology.
Click the button below to confirm your acceptance. You'll be asked to confirm your details and sign electronically — the whole process takes under a minute.
Accept this ProposalBy clicking Accept, you confirm you have read and agree to all inclusions, exclusions, general conditions and payment terms set out in this proposal. A confirmation email will be sent to you automatically on submission.